Convoy of Hope

Convoy of Hope Blog Banner

Photo Credit: Mitch Epsy | Springfield, MO Project: Convoy of Hope

Summary: Medley supplied Convoy of Hope with narrow aisle equipment, pallet jacks, ride-on sweeper scrubbers, all of the warehouse racking design, layout, materials, and installation.  The recently completed World Distribution Center features a warehouse with 250% more storage capacity than Convoy’s previous warehouse, 23 loading docks, a designated volunteer area, and a dedicated space for Convoy’s Disaster Services team and its specialized fleet.

Objective: Convoy of Hope has been a Gammon account for several years. Medley supplied them with narrow aisle equipment, pallet jacks, all of the warehouse racking design, layout, materials, and installation.

Timeline: Approximately 2 years ago we started on the new building project and showed them higher storage capacity options via the use of narrow aisle operating equipment.

Result: They are very happy with the new warehouse design and the equipment that has allowed them to achieve higher capacity storage within their existing footprint.

Leave a Comment